Project Details
SCOPE OF WORKS:
- Enabling Works
- Reduced Level Excavation
- Pile Mat
- Piling Attendance
- King Post Retaining Walls
- Foundations
- Drainage
- Service Ducts
- 3 x Reinforced Concrete Frames (21 floors total)
Key Quants:
- Excavation: 17,200 m3
- Concrete: 7,100 m3
- Reinforcement: 1,090 tons
- Formwork: 27,700 m2