Project Details
Scope Of Works:
- Enabling Works
- Reduced Level Excavation
- Pile Mat
- Piling Attendance
- Retaining Walls
- Foundations
- Drainage
- Service Ducts
- Reinforced Concrete Frames (11 floors)
Key Quants:
- Excavation: 1,250 m3
- Concrete: 2,100 m3
- Reinforcement: 330 ton
- Formwork: 8,870 m2