Scope of Works:
- Enabling Works
- Reduced Level Excavation
- Pile Mat
- Piling Attendance
- Foundations
- Drainage
- Service Ducts
- Reinforced Concrete Frame (9 floors)
Key Quants:
- Excavation: 3,076 m3
- Concrete: 4,092 m3
- Reinforcement: 924 tons
- Formwork: 20,860 m2