Project Details
Scope of Works:
- Enabling Works
- Reduced Level Excavation
- Pile Mat
- Piling Attendance
- Foundations
- Drainage
- Service Ducts
- Reinforced Concrete Frame (9 floors)
Key Quants:
- Excavation: 2,260 m3
- Concrete: 4,770 m3
- Reinforcement: 650 tons
- Formwork: 19,780 m2