Project Details
Scope of Works:
- Reduced Level Excavation
- Pile Mat
- Piling Attendance
- Foundations
- Drainage
- Service Ducts
- Slip-form Core
- Reinforced Concrete Frame (20 floors)
Key Quants:
- Excavation: 5,450 m3
- Concrete: 11,720 m3
- Reinforcement: 1,810 tons
- Formwork: 49,515 m2