Project Details
Scope of Works:
- Enabling Works
- Reduced Level Excavation
- Pile Mat
- Piling Attendance
- Foundations
- Drainage
- Service Ducts
- Reinforced Concrete Frame (20 floors)
Key Quants:
- Excavation: 5,250 m3
- Concrete: 8,900 m3
- Reinforcement: 1,200 tons
- Formwork: 38,850 m2