Project Details
Scope of Works:
- Enabling Works
- Reduced Level Excavation
- Pile Mat
- Piling Attendance
- Foundations
- Drainage
- Service Ducts
- Reinforced Concrete Frames (4 floors)
Key Quants:
- Excavation: 1,500 m3
- Concrete: 3,350 m3
- Reinforcement: 600 ton
- Formwork: 11,550 m2