Project Details
Scope of Works:
- Reduced Level Excavation
- Pile Mat
- Piling Attendance
- Foundations
- Drainage
- Service Ducts
- 2 x Reinforced Concrete Basements
- Reinforced Concrete Frame (12 floors)
Key Quants:
- Excavation: 1,020 m3
- Concrete: 2,240 m3
- Reinforcement: 430 ton
- Formwork: 7,800 m2