Scope of Works:
- Enabling Works
- Reduced Level Excavation
- Pile Mat
- Piling Attendance
- Foundations
- Drainage
- Service Ducts
- Reinforced Concrete Frames (4 floors)
Key Quants:
- Excavation: 4,850 m3
- Concrete: 2,480 m3
- Reinforcement: 310 ton
- Formwork: 8,750 m2